
For the safe, dust free disposal of rubble from high levels. Quickly and easily assembled from 1.2m (4') sections connected together by wire ropes and clips. Top hopper sections allows rubble to be barrowed into chute.
* Used with the Rubbish Chutes (Code#50510)
* Also available: window & platform fixing frames (see photos below) Makes easy installation of the hopper & chutes (Available for 15.00e per day) (Code#50520 / #50521)
*Customers are responsible for Installation*
Weight:
4 Hrs | 1 Day | Ex Day | Week | Week End |
---|---|---|---|---|
- | €5.00 | €5.00 | €30.00 | €7.00 |